Since the mid-1970s spent nuclear fuel is to be disposed of in a geologic repository. Early plans for reprocessing the spent fuel were abandoned already in the early 1980’s. In the 1970’s Svensk Kärnbränslehantering AB (Swedish Nuclear Fuel and Waste Management Company), SKB, was established to manage the waste (*01 Sweden once dumped low-level waste in the Atlantic Ocean (in 1969) and twice (1959 and 1961) in the Baltic Sea.(*02)
The country wants to dispose its nuclear waste, packed in copper to ensure long-term safety, in granite from 2023/25 on. But problems with copper and geological stability have been published widely. Awaiting final disposal spent fuel is stored in an interim facility in Oskarshamn, called Clab. Low and intermediate-level waste is currently stored in a final repository 50 meters deep in the crystalline basement near the nuclear power plant in Forsmark.(*03)
Long-lasting search
In Sweden, the Parliament decided to a Nuclear Power Act in 1977, which asked for an “absolutely safe solution” for final disposal of nuclear waste and makes the nuclear industry responsible for the management of the waste. The Swedish government started a procedure, called scientific mediation, to clarify the scientific differences. This was followed by discussions with the public, aimed at participation in the decisionmaking.(*04)
Research to find a final disposal site has taken place for since 1977. Eleven sites were examined, with extensive work undertaken at 7. Test-drillings was planned in 5, but only two of these allowed SKB to carry out even an initial feasibility study: Storuman and Malaa. Several possible locations for the final disposal have been dropped out after referendums, such as Storuman, Malaa(*05) and Gaellivare.(*06) It was obvious by then that the best chance for a repository would be in a municipality that has a nuclear power plant: Forsmark and Oskarshamn, or at the Studsvik research reactor.(*07) The idea is that in these locations such an initiative will most likely gain sufficient support, and SKB limited themselves to the choice of a site with nuclear power activities. (*08) Municipalities can present themselves voluntarily as a host location, but can also withdraw in a later stage. Although there is a law enabling the government under very specific conditions to overrule such a veto, but this provisions seems very hard to use for any government: this will not happen in practice.(*09)
In 1998, SKB director Peter Nygaards stated that the Swedish government should be prepared to offer financial incentives to a community willing to host the repository. He compared this with the money the government pays to local communities to take in refugees. Similarly, any disposal of nuclear waste must also be reimbursed. Nygaards also said he don’t want to fix the moment of permanently sealing a repository. If the repository is full one should consider if closing is not a better option so that “future generations can open it if they need to?” Nygaards said: “It is not wise to make a decision today for 100,000 years from now”.(*10)
Besides the locations with nuclear power plants, only Tierp volunteered to be a host community for the repository. (*11) In November 2001 the government approved research in Tierp, Forsmark and Oskarshamn,(*12) but in April 2002, the city council of Tierp decided to withdraw.(*13) In June 2009 SKB selected Forsmark.(*14) The repository is proposed to be sited adjacent to the Forsmark nuclear power plant on the Baltic Sea coast. On 16 March 2011, SKB applied for a permit.(*15) It plans to begin site works in 2013, with full construction starting in 2015, and operation after 2020.(*16)
Criticism on safety
The KBS method was developed in the 1970s. The basis is a geologic repository at about 500 meter depth in granite bed-rock and the long-term safety is to be guaranteed by artificial barriers – copper canisters surrounded by a bentonite clay buffer.(*17)
There is severe criticism on the disposal method. The nuclear waste is disposed of at 500 meters depth in granite. According to SKB, this is a stable geological formation. But paleo-geophysicist Nils-Axel Mörner states that the stability is not true. Since the end of the last Ice Age the ground went upwards with a rate of one millimeter per day, there were 58 serious earthquakes and 16 tsunamis. As a consequence of these and other factors Mörner finds the repository unstable and not safe.(*18)
In November 2009 another problem arose: the use of copper. The nuclear waste is encased in a copper layer of five centimeters, which has to remain intact for 100,000 years. Copper corrodes in environments where oxygen is present. The process is easy to observe on copper roof materials that turn green from oxidation. When the industry’s KBS-method was developed in the 1970’s the understanding was that copper does not corrode at all in an anoxic (oxygen-free) environment in the bedrock. During the 1980’s a researcher from the Royal Institute of Technology (KTH) in Stockholm, Gunnar Hultquist, presented new findings that showed that copper could corrode in environments without oxygen, as long as there is water present. The new findings were denied by SKB and ignored by the authorities. During the autumn of 2007 Gunnar Hultquist and a colleague Peter Szakálos presented the findings again, this time with more experimental results.(*19) This is noticed by investigation of copper artifacts from the Swedish warship Vasa, which sunk in 1628: the copper had become much thinner than expected.(*20) Copper corrosion has caused a discussion about the KBS method in Sweden as the findings threaten basic assumptions underlying the long-term safety of the KBS method.
A geologic repository in Swedish bedrock at a depth of 500 m. has groundwater flowing through the repository, says Dr. Johan Swahn, Director of the Swedish NGO Office for Nuclear Waste Review (MKG) at a hearing on the management of nuclear waste at the European Parliament’s Committee on Industry, Research and Energy.(*21) A repository using the KBS method therefore has to rely on manmade barriers (clay and copper) to isolate the nuclear waste from the environment. The chemical and biological environment will in the long term threaten the artificial barriers of copper and clay in ways that are difficult to foresee. The relatively dry rock (for the KBS method) chosen by SKB in Forsmark puts stress on the clay barrier and opens up for new questions on copper corrosion processes. In Sweden there will be one or more Ice Ages during the next 100,000 years and glaciation will lead to variations in the chemical and biological environment that will affect the man-made barriers.
The safety case for Swedish KBS method is severely questioned and licensing is uncertain. The problems for the KBS method has opened up for questioning whether disposal methods relying on artificial engineered barriers should be implemented at all. The Swedish and Finnish repository programs for spent nuclear are entirely interdependent. If the Swedish program fails, so does automatically the Finnish.(*22) In short, also in Sweden, nuclear waste disposal is not a fait accompli.
The Swedish Radiation Safety Authority (SSM) has recommended a tripling of the fee paid by the country’s nuclear power industry towards paying for management of the country’s nuclear waste. Basing its assessment on information gathered from the relevant organizations – including cost estimates from SKB – SSM has recommended to the government that the fee should be set at 3 öre per kWh of nuclear electricity produced. The current level is 1 öre per kWh. (1 öre is worth approximately US$0.001) According to SSM, much of the increase is down to new estimates from SKB indicating that the remaining costs of the country’s planned final repository for used nuclear fuel have grown by about SEK 18 billion (US$2.7 billion) from previous estimates made in 2008. SSM also says it believes that SKB has underestimated future costs, and it has adjusted the proposed fee increase to reflect this.(*23)
*01- See for an extensive historical overview of the waste problem in Sweden: Miles Goldstick et.al.: Nuclear waste in Sweden –The problem is not solved!, FMKK, August 1988
*02- IAEA: Inventory of radioactive waste disposals at sea, IAEA-Tecdoc-1105, August 1999
*03- SKB: Our current facilities, company website, visited April 2012
*04- Matthijs Hissemöller and Cees J.H. Midden, Technological Risk, Policy Theories and Public Perception in Connection with the Siting of Hazardous Facilities, Charles Vlek and George Cvetkovitch (eds), Social Decision Methodology for Technological Projects, Kluwer Academic Publishers, 1989, p. 173-194
*05- PJ Richardson, Public Involvement in the Siting of Contentious Facilities; Lessons from the radioactive waste repository siting programs in Canada and the United States, with special reference to the Swedish Repository Siting Process, Swedish Radiation Protection Institute, August 1997, p 26-27
*06- Nuclear Fuel: Another Swedish community rejects repository, 16 June 1997, p.17
*07- Nucleonics Week: Malaa voter rejection turns SKB back to plant sites for repository, 25 September 1997, p.15
*08- Marianne Löwgren: Nuclear Waste Management in Sweden: Balancing Risk Perceptions and Developing Community Consensus, in: Eric B. Herzik and Alvin H. Mushkatel, Problems and Prospects for Nuclear Waste Disposal Policy, Greenwood Press, Westport, Connecticut / London, 1993, p. 105-121
*09- Olof Söderberg: Who Makes Which Decisions When?, in Proceedings DisTec’98, Disposal Technologies and Concepts 1998, International Conference on Radioactive Waste Disposal, 9-11 September, Hamburg, pp. 633-639
*10- Nuclear Fuel: New SKB head endorses cash incentives for repository host, 9 March 1998, p. 8-9
*11- Mark Elam and Göran Sundqvist, The Swedish KBS project: a last word in nuclear fuel safety prepares to conquer the world?, In: Journal of Risk Research, Volume 12 Issue 7 & 8 2009, December 2009, p.969–988
*12- Nuclear Fuel: Swedisch government gives SKB approval to study 3 sites for possible repository, 12 November 2001, p. 8
*13- Nuclear Fuel: Tierp town council votes against site testing for Swedish repository, 15 April 2002, p.10-11
*14: SKB: SKB selects Forsmark for the final repository for spent nuclear fuel, press release 3 June 2009
*15: SKB: SKB turns in application for permit to build a final repository in Forsmark, press release 17 March 2011
*16- World Nuclear Association: Nuclear Power in Sweden, February 2012
*17- SKB: Our method of final disposal, company website,
*18- Nils-Axel Mörner: The Shameful Nuclear Power, presentation 16 April 2008. See also: The uplift of Fennoscandia at: http://www.pog.nu/01research/1-2_fennoscandia.htm
*19- MKG: Copper corrosion, website MKG (Swedish NGO Office for Nuclear Waste Review)
*20- Technisch Weekblad, 21 November 2009
*21- Dr. Johan Swahn: Considerations on nuclear waste management in Sweden, presentation at the European Parliament’s Committee on Industry, Research and Energy public hearing on management of nuclear waste, 1 December 2010
*22- Johan Swahn: The Scandinavian Nuclear Waste Strategies, MKG, Expert Hearing Greens in het European Parliament, 8 juni 2010, p.10
*23- World Nuclear News: Swedish waste fees rise to reflect repository cost, 10 October 2011