As in almost all countries, in France, the storage of radioactive waste is controversial. Pressure groups believe the storage of high-level radioactive waste in clay, planned at Bure from 2025 at the earliest, is in violation of the legislation of the government, because there is only one underground laboratory and a 1991 law requires at least two. All spent fuel is reprocessed in La Hague. France dumped low- and intermediate level waste in sea twice, from 1967-1969.(*01)
LLW
Low-level radioactive waste was stored at the above-ground site CSM (Centre de Stockage de la Manche) from 1969 till 1994. In 1996, the government-appointed commission ‘Turpin’ concluded that the site also contains long-living and higher radioactive waste and that the inventory was not exactly known. The commission also found that radioactivity from the site is leaking into the environment. It however concluded that dismantling and reconditioning the waste would cost too much and might generate a significant risk to the workers involved.(*02)
ANDRA is currently operating two disposal facilities: one for short-lived low-level and intermediate-level waste (CSFMA) and the other for very-low-level waste (CSTFA), both situated in the Aube district.(*03)
The 2006 Planning Act calls for the commissioning by 2013 of a storage facility for low-level long-lived wastes. The opening of this new sub-surface (15 m to 100 m depth) facility has been seriously delayed, to at least 2019, by massive protests in the areas considered as possible sites. ANDRA launched a public call to 3,115 communities in 2008 for volunteers to host the facility. Forty-one applied for consideration and, in June 2009, the government selected two small villages both in the Aube department that already houses the two operating disposal facilities for short-lived wastes. But both communities withdrew “under the pressure of the opponents.”(*04)
Currently, the project is suspended and ANDRA and the government are looking for a new approach. Pending the creation of a suitable disposal facility, existing LLW-LL waste is stored at the production sites or in facilities which have traditionally used radioactive applications.
ILW-LL and HLW
Pending the commissioning of a deep repository, intermediate-level, long-lived waste (ILW-LL) and high-level waste is stored at their production sites, mainly La Hague, Marcoule and Cadarache.
In 1979, the French National Radioactive Waste Management Agency ANDRA was established to manage and provide storage of nuclear waste. From 1987 to 1990 field study was conducted but protest against four test drilling forced the government to stop research and develop new policy.(*05) In 1991 parliament passed the Nuclear Waste Act, which regulated the new policy. The law is meant as a legal instrument for the creation of underground research laboratories, where studies will be conducted in potential host formations, at least at two locations and a best site will be chosen in 2006. It clearly prohibits the actual storage of nuclear waste in these laboratories. For this a new law had to be adopted after 2006.(*06)
Shortly thereafter ANDRA began with research in three new locations, which met fierce resistance. The French government stopped the investigation and wanted to consult the population. The government contracted for this reference Christian Bataille, then a member of parliament and undisguised supporter of nuclear power.(*07) In his search for a department that wanted to host an underground laboratory he spoke with people from different locations, elected officials and associations, but that did not lead to a broad support. Sometimes the disposal plans caused big splits in small local communities. In 1994, this disagreement was the reason why the mayor Michel Faudry from the potential host community Chatain in the department of Vienne committed suicide.(*08)
On January 6 1994, after the consultations Bataille chose three candidate departments for the underground high-level waste laboratories: Meuse, Gard, Haute-Marne and Vienne. Whether that laboratory is converted into a HLW-repository is a choice that will be made later. If a permit for the construction of an underground lab is given, the host community receives a compensation of €10 million per year during construction and operation of the laboratory.(*09)
Local groups were very dissatisfied with the state of affairs. In December 1997, the Conseil d’Etat rejected a complaint laid down in 1994 by residents of Meuse and Vienne on the Bataille mission. They stated that there had never been a real involvement of the affected population, as required by law. With this decision the Conseil d’Etat did not follow the advice of the so-called government commissioner, who agreed with the plaintiffs.(*10) Elected officials near Bure organized a nation-wide committee of elected officials opposed to underground labs.(*11) Associations of winegrowers in several area’s (Cotes-du-Rhone and Roussillon) fear that their sales market will collapse if a nuclear waste repository is constructed in their neighborhood.(*12)
In 1997, in response to the protests, the French government decided to commission the National Assessment Commission (CNE) to study retrievability.(*13) CNE, a group that reviews progress on HLW management for government and parliament, published its report ‘Thoughts on retrievability’ in June 1998. CNE proposes retrievable storage (for TRU waste: non-heat-generating transuranic wastes) be licensed for relatively short periods – 50 years – to ensure that a decision must be taken on a regular base on whether or not the facility should be kept open. It also recommends long-term interim storage for spent fuel on the grounds that the fuel contains valuable energy roducts.(*14) In August 1999, the government authorized ANDRA to start work on an underground waste lab in a clay formation in Bure and to begin the process of finding a second site in granite. The Bure license would expire at 31 December 2006 by which time the parliament has to decide whether to transform the Bure site into a repository.(*15)
In December 1998 the departments Gard en Vienne were considered unsuitable because of geological reasons. The French government okay’d the waste lab at Bure in clay, but called for a new granite site.(*16)
Before the end of 2006 the government had to find a way out of a tough situation. The Nuclear Waste Act from 1991 required that at least two research laboratories should have been established, from which – following similar research – a choice had to be made. But there is only one underground laboratory: Bure.
Many environmental groups think that the government and ANDRA therefor do not comply with the law. In a December 2009 email Markus Pflüger of the anti-nuclear group Stop Bure in Trier (Germany) emphasized that again.(*17) But he also points at the fact that geological fault lines in the subsurface of Bure are denied by ANDRA: and, according to Pflüger, these fault lines are definitely a safety risk.
In June 2006 Planning Act was published.(*18) Besides ‘optimizing repository concepts’ and complete experimental program with technological demonstrations, it states that all operators of nuclear installations must estimate the future costs for the management of their spent fuel, decommissioning operations and the management of radioactive waste, and must allocate “the required assets to the coverage of those provisions.”
Commercial reprocessing, although originally introduced to obtain plutonium fuel for starting up fast-neutron reactors, is now clearly established as the national policy for spent-fuel management. A disposal facility for long-lived intermediate and high-level wastes is required to be in operation by 2025. No license shall be granted, however, “if the reversibility of such a facility is not guaranteed.” While the conditions of reversibility will be defined in a subsequent law, its minimum duration is one hundred years.
The license for the underground research laboratory in Bure (officially called LSMHM URL, often Bure is not even referred to) was initially until the end of 2006, but was extended on 23 December 2006 by the Government until the end of 2011. Therefore ANDRA has filed an application to renew it until 2030. The public inquiry was held from October 26 to November 30 and the licensing decree was granted on December 20, 2011.(*19) By making retrievability compulsory and to commission longer research, the French Government is circumventing the 1991 Nuclear Waste Act.
In early 2012 ANDRA signed a six-year contract with Gaiya as main contractor to project manage the conceptual and front-end phases of the Centre Industriel de Stockage Géologique project, dubbed “Cigeo”. The first conceptual study phase is to be conducted in 2012 and will lead on to a public consultation that will take place in 2013. The storage facility will be developed on a depth of 500 meters, and will exploit the properties of the Bure clay formation as a “geologic barrier to prevent any potential spread of radioactivity”. Although Cigeo will be designed to accommodate the wastes permanently, French law requires that storage can be reversible for at least 100 years.(*20)
*01- IAEA: Inventory of radioactive waste disposals at sea, IAEA-Tecdoc-1105, August 1999
*02- Greenpeace: Nuclear Waste Management: The lesson from the CSM disposal site, 30 May 2006
*03- ANDRA: The French National Radioactive Waste Management Agency, May 2010, p.3
*04- International Panel on Fissile Materials: Managing spent fuel from nuclear reactors, 2011, p.38
*05- Yannick Barthe: Framing nuclear waste as a political issue in France, in: Journal of Risk Research, Volume 12 Issue 7 & 8 2009, p.941 – 954, December 2009.
*06- Republique Francaise: Law no.91-1318 of December 30, 1991 on Radioactive Waste Management, 30 December 1991, French version and English translation.
*07- Nuclear Fuel: French waste negotiator takes up Pilgrim’s staff, 18 January 1993, p.14-15
*08- Nuclear Fuel, Citing pressure, Mayor of potential HLW laboratory site commits suicide, 31 January 1994, p 5 en 6.
*09- Nuclear Fuel: France okays work on HLW lab sites, ending four year stay, 17 January 1994, p 15-16
*10- Nuclear Fuel: French court rejects request aimed at halting search for waste labs, 29 December 1997, p.9-10
*11- Nuclear Fuel: Eastern Mayors fight to keep ANDRA from building waste labs, 22 September 1997, p.10
*12- Nucleonics Week: French localities’ vote vary on nuclear waste lab siting, 24 April 1997, p. 13-14
*13- Nuclear Fuel: French government gives itself a year to decide on waste labs, 22 September 1997, p. 8-9
*14- Nuclear Fuel: French committee signals shift in approach to long-term storage, 13 July 1998, p. 11-12
*15- Nuclear Fuel: ANDRA gets license for waste lab, court challenge from Greens, 23 August 1999, p.14-15
*16- Nuclear Fuel: French ministers okay waste lab at Bure but call for new granite site, 14 December 1998, p.3-4
*17- Email Markus Pflüger to Herman Damveld, 5 December 2009.
*18- Republique Francaise: The 2006 Programme Act on the Sustainable Management of Radioactive Materials and Wastes, 28 June 2006
*19- ANDRA, ASN, CEA, IRSN: Radioactive Waste Management Programmes in OECD/NEA Countries: France, March 2012, p.16
*20- World Nuclear News, Next phase for French geological disposal, 5 January 2012