The National Nuclear Energy Commission (Comissão Nacional de Energia Nuclear, CNEN) is responsible for management and disposal of radioactive wastes. Legislation in 2001 provides for repository site selection, construction and operation for low- and intermediate-level wastes.
A long-term solution for these is to be in place before Angra 3 is commissioned. Low and intermediate level waste is stored on site of Angra nuclear complex and on other sites where it is produced.(*01)
A location for a national waste repository for LLW and ILW waste is due to be chosen in 2011 (but delayed again)(*02) and planned to start operation in 2018. Two options are being considered: the construction of a repository exclusively for waste from Angra or a facility that would accept material from all nuclear and radioactive installations in Brazil.(*03) Used fuel is stored at Angra pending formulation of policy on reprocessing or direct disposal.(*04)
HLW disposal: when, where and how unknown
Currently, there is no decision about the way of final storage of the waste. Brazil has not defined a technical solution for spent fuel or high-level waste disposal. Spent fuel is not considered radioactive waste. Therefore, the policy adopted with regards to spent fuel is to keep the fuel in safe storage until an international consensus and a national decision is reached about reprocessing and recycling the fuel, or disposing of it as such.(*05)
High-level wastes, after been stored on site would then be moved to an interim storage location for 500 years. This interim site is expected to begin operation in 2026; a proposed plan was due to be finished by 2009, and a prototype validated by 2013, according to Eletronuclear.(*06) For final disposal a deep geological facility has been foreseen, but a timeframe has not been developed.(*07)
Opposition to nuclear power and waste storage is strong in Brazil. Even CNEN admits that “political and psycho social aspects related to the subject of radioactive waste disposal (“Not in my backyard syndrome”) contribute enormously to the difficulties faced by the Brazilian Government in the establishment of a national waste management policy.”(*08)
Sources
*01- IAEA, Brazil country report: 2006
*02- we can find no information that suggests a location has been chosen –March 2012
*03- Nuclear Engineering International: Nuclear power in Brazil, 1 June 2010
*04- World Nuclear Association, Nuclear Power in Brazil, November 2011
*05- CNEN: National report of Brazil 2011, for the fourth review meeting of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, October 2011
*06- Nuclear Engineering International
*07- CNEN, 2011
*08- CNEN, National report of Brazil 2008, for the third review meeting of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, October 2008