SPAIN

Low- and intermediate level wastes is stored at ENRESA’s storage facility at El Cabril, Cordoba. Spent fuel is stored at the reactor sites awaiting a centralized interim storage and geological disposal A final geological disposal facility is not expected before 2050, at the earliest. No reprocessing of spent fuel takes place, but in the past spent fuel of Vandellos-1 reactor has been reprocessed.

Low-level Waste
In the 1950s, the El Cabril uranium mine was shut down and started to be used for storing low and intermediate level waste. In 1986 ENRESA took responsibility for El Cabril and moved the waste from the mines to new built buildings on the same site.(*01) It is planned to receive waste until 2015.(02) The state-owned radioactive Waste management organization ENRESA, created in 1984, is responsible for managing radioactive waste and decommissioning of nuclear plants.(*03)

High-level waste and spent fuel
ENRESA is since 1987 developing a disposal program aimed at providing a final solution for the spent fuel and high level waste. The program comprised of three areas: identification of suitable sites, conceptual design and performance assessment of a geological repository and research and development.(*04) At that time a repository was expected to be realized by 2020. By end-1990, some 25,000 km2 of possible regions were found. Finally, some 30 areas were identified for further research.(*05)

Although ENRESA had identified favorable areas for further underground research, work was halted in 1996 due to public opposition; or in the words of ENRESA: “the reaction of the public advised to discontinue any field work in 1996.”(*06) In 1995, it had become known among environmental groups that ENRESA had plans for the construction of underground disposal laboraties and a list of possible locations was released. The groups accused ENRESA of not having informed the public and of having inspected possible sites.
Large demonstrations were organized which culminated in a demonstration of 20,000 people in 1998 at Torrecampo.(*07) At the end of 1996, the Senate Commission for Industry established an inquiry commission to develop a new waste policy. It had to study the difficulties in finding a site for waste disposal and should include socio-political and public acceptance aspects. The commission’s work was expected to result in guidelines for the government to develop a legal framework for siting. The commission received contributions from groups and institutions and visited other countries for
comparison.(*08)

In 1999 the 5th Radioactive Waste Plan was adopted with a new policy: construction of a centralized interim HLW storage by 2010 for reprocessing waste as well as spent fuel; and no decisions about final disposal before the year 2010.(*09)
In mid 2006 Parliament approved ENRESA’s plans to develop an interim centralized high-level waste and spent fuel storage facility by 2010, and the Nuclear Safety Council CSN approved its design, which was similar to the Habog facility near the Borssele power plant in the Netherlands. In December 2009 the government called for municipalities to volunteer to host this €700 million Almacen Temporal Centralizado (ATC) facility. The government offered to pay up to €7.8 million annually once the facility is operational. It is designed to hold for 100 years 6700 metric tons of used fuel and 2600
m3 of medium-level wastes, plus 12 m3 of high-level waste from reprocessing the Vandellos-1 fuel. The facility is to be built in three stages, each taking five years. Fourteen towns volunteered, attracted by the prospect of a €700 million investment over 20 years and the annual direct payments, plus many jobs, but only eight were formally accepted.(*10)

In September 2011 the Ministry for Industry announced its selection and rankings: Zarra (Valencia) 736 points; Asco (Tarragona) 732 points; Yebra (Guadalajara) 714 points; Villar de Canas (Cuenca) 692 points. In December 2011 the Ministry announced that Villar de Canas had been selected, though only a 60-year storage period was mentioned. Pending construction, low- and medium-level wastes continues to be sent to ENRESA’s storage facility at El Cabril, Cordoba, which has operated since 1961. Used fuel remains at individual power plants.(*11)

For Jose Maria Saiz, the mayor of Villar de Canas, the financial compensation and the promise of 300 jobs were compelling arguments to get the storage to his place. That
doesn’t alter the fact that environmental groups and trade unions are against the storage.(*12) And in March 2012 it turned out that promised regional jobs were not materializing and little is left of the initial optimism.(*13)

The General Plan on Radioactive Waste suggests that the operation of a deep repository in Spain would probably start in 2050. Therefore, the period between 2025 and 2040 would be focused on decision-making process and site characterisations, whereas from 2040 to 2050 construction would take place. A programme of activities between 2006 and 2025 to meet the objective of having a repository by 2050 is lacking (Fundación para Estudios sobre la Energía, 2007). The high level of priority given to the interim storage facility has delayed the interest and the research efforts in deep geological disposal. Furthermore, the construction of the centralised storage facility allows decisions on final management to be postponed.(*14)

Sources
*01- COWAM: Nuclear Waste Management in Spain : El Cabril and on site storage, COWAM European Concerted Action, February 2005
*02- Damveld/Van den Berg: Discussion on nuclear waste: A Survey on Public Participation, Decision-making and Discussions in Eight Countries; Spain, January 2000, p.65
*03: ENRESA: Who we are, company website, April 2012
*04- J.L. Santiago, J. Alonso, et al: Geological disposal strategy for high level waste in Spain, in: Distec Proceedings, Conference on Disposal Technology, Hamburg, September 1998, p. 206-211
*05- P. Richardson: The Virtual Repository of Radwaste Information: Spain, July 1997 (currently pay site).
*06- J.L. Santiago, J. Alonso, et al.
*07: WISE News Communique: Spain: protests against possible radwaste storage site, Nr. 489, 3 April 1998
*08- J.L. Santiago, J. Alonso, et al.
*09- OECD/NEA: Radioactive waste management programmes in OECD/NEA Member countries: Spain , 2005, p.4-5
*10- World Nuclear News: Spain selects site for waste storage, 3 January 2012
*11- World Nuclear Association: Nuclear Power in Spain, Update April 2012
*12- Deutschlandradio: Ein spanisches Dorf jubelt, weil es Atommüll lagern darf (A spanish town rejoices, because it can store nuclear waste), 16 February 2012
*13- Ee-news: Spanien: Atommüll-Lager bringt den Fortschritt nicht (Spain: nuclear waste storage does not bring progress), 21 March 2012
*14- Meritxell Martell Lamolla: Identifying remaining socio-technical challenges at the national level: Spain, InSOTEC Working Paper (Draft), 1 March 2012