UNITED KINGDOM

In 1981, the government in Britain decided to postpone plans for the disposal of high-level radioactive waste. In 2010, the NDA came up with a plan that has to lead to final disposal of high-level waste from 2075. The government claims to follow an advisory committee, but the committee thinks the government gives a distorted view of their advice. Nuclear fuel is reprocessed and liquid and glassified waste is stored at Sellafield until a final repository will be opened.

Low- and medium-level radioactive waste
Great Britain dumped solid low and intermediate level radioactive waste in sea from 1949 untill 1982.(*01) A near-surface repository in Drigg (near Sellafield) has operated as a national low-level waste disposal facility since 1959. Wastes are compacted and placed in containers before being transferred to the facility.(*02)
Investigation from 1978 to 1981 into the disposal of high-level radioactive waste in Caithness led to much opposition. In 1981, the British government therefore decided to postpone a decision on the storage of high-level waste by fifty years.(*03)Although in 1981 the government decided to postpone the plans for a high-level radioactive waste facility, the search for a storage place for low- and medium-level radioactive waste had to be continued. For this purpose the British nuclear industry created Nirex in 1982. After repeated selections of a number of new sites and abandoning them again, Nirex chose Sellafield in 1991 for detailed studies on a deep repository for long-lived low-level and intermediate level radioactive waste.(*04)

In March 1997, however, the government rejected Sellafield due to the unfavorable geological conditions. The government has also decided that a new choice of location can take place only after the government has adopted new procedures for that purpose, and for that participation is required. It took until 2001 before new procedures have been settled.(*05) It will take at least 25-30 years before a deep geological disposal facility for low en intermediate level radioactive waste will be in operation.(*06) Large information campaigns for years and years hasn’t led to a final repository for nuclear waste.

High-level radioactive waste
After the 1981 postponement of a decision on the storage of high-level, the parliament established a new waste policy in 2001, which led to the foundation of the Nuclear Decommissioning Authority (NDA) in 2002. The government set up the commission on radioactive waste management (CoRWM) in 2003 to consider long-term waste strategy. This committee has to advise the government on all sorts of nuclear waste, of which “inspire public confidence” and “protect people and the environment” have been central principles.(*07) The CoRWM released an advice in July 2006.(*08) The committee calls robust interim storage (100 years) and geological disposal as the end-point for all high and intermediate level waste. in deep underground after intensive research into the long-term safety of disposal. For the realization of the storage “voluntarism and partnership” is important: the local population should be willing to cooperate. The government adopted the recommendations of the CoRWM in October 2006 and initiated a new round of official consultations that would end in 2008. Nirex was wound up and the government-owned Nuclear Decommissioning Authority was given responsibility for the long-term management of all UK radioactive wastes.
Meanwhile, it became clear there was a more positive feeling about the construction of nuclear power plants. CoRWM found it necessary to emphasized that its opinion is about nuclear waste that already exists (‘legacy waste’): with nuclear waste from new-build power plants other ethical and political aspects play a role than with the present waste. CoRWM states there was no distinction, technically. Both could be accommodated in the same stores and disposal sites. But creating new-build wastes was a choice, and there were alternatives. The political, social and ethical issues surrounding the deliberate creation of new wastes were therefore quite different from those arising from the inevitable need to manage the legacy.(*09) CoRWM argued that the waste implications
of any new build proposals would need their own assessment process.

On 10 January 2008, the government announced plans for the construction of new nuclear power plants, followed by a new nuclear waste policy on 12 June 2008.(*10) The government indicated to make no distinction between waste, which is now simply inevitable, and waste from new power plants. The government said that principles of “voluntarism and partnership” are to be used in the selection process and calls on municipalities to present themselves to host a disposal facility. Most of the land in the UK is thought to be geologically suitable for the store.(*11)

Several members of the first CoRWM don’t agree with the government. On a November 20, 2009, letter to the Secretary of State for Energy and Climate Change(*12), Ed Miliband, they stated that the government has reproduced the CoRWM report in an incorrect and distorted way. “In conclusion we reiterate that we do not consider it credible to argue that effective arrangements exist or will exist either at a generic or a site-specific level for the long—term management of highly active radioactive wastes arising from new nuclear build.”
The members also protest against the fact that the government makes no distinction between unavoidable nuclear waste, which has been produced already, and new nuclear waste that can be avoid. “However, it is clear that government has conflated the issue of new build with legacy wastes and thereby intends the CoRWM proposals to apply to both. No separate process, as suggested by CoRWM1, for new build wastes is contemplated. There will be no opportunity for communities selected for new nuclear power stations to consider whether they wish to volunteer to host a long term radioactive
waste facility; it will simply be imposed upon them.”

On 15 January 2010, the Scottish government said that nuclear waste must be just stored above ground at or close to existing nuclear facilities (in Dounreay, Hunterston, Torness and Chapelcross), reducing the need for waste to be transported long distances. A consultation exercise on the issue has been launched. Underground storage is not eligible because “Having an out of sight, out of mind policy is losing support.” The strategy is at odds with the UK government’s preferred option of storing nuclear waste deep underground.(*13)
In March 2010, the NDA published a report in which it states that “a geological disposal facility will be available to receive ILW and LLW in 2040 and HLW and spent fuel in 2075”,(*14) but spending cuts could delay the plans, and community support is vital.(*15)
The government thinks this takes too long, and Energy Minister, Charles Hendry, asked NDA’s Radioactive Waste Management Directorate (RWMD) to look at reducing the timescales for first emplacement of high level waste (currently 2075) as well as the dates for spent fuel and waste from new build power stations presently indicated to take place in 2130.(*16)
In a preliminary response to the Minister’s request RWMD says: “There are fundamental principles that are critical to the success of the implementation of the geological disposal programme. These are: the vital role of voluntarism and partnership with local communities (…); and, the need for technical and scientific work necessary to underpin the safe disposal of radioactive waste to be done rigorously and to the required high standard.”(*17) RWDM will evaluate and “be in a position to consider whether or not changes to the programme would be realistic” in December 2012. (*18)
The long and tortuous story of UK radioactive waste policy demonstrates that achieving legitimacy around the management of these wastes is a social process with long time horizons. After 50 years of policies, institutional change and debate, extraordinarily little has been achieved in securing the long-term disposition of wastes.

Sources:
*01- IAEA: Inventory of radioactive waste disposals at sea, IAEA-Tecdoc-1105, August 1999, p53
*02- Low Level Waste Repository Ltd: http://www.llwrsite.com
*03- Gordon MacKerron and Frans Berkhout: Learning to listen: institutional change and legitimation in UK radioactive waste policy; in: Journal of Risk Research, Volume 12 Issue 7 & 8 2009, December 2009, p. 989 – 1008.
*04- John Knill: Radioactive Waste Management: Key Issues for the Future, in: F. Barker (ed), Management of Radioactive Wastes. Issues for Local Authorities. Proceedings of the UK Nuclear Free Local Authorities Annual Conference 1997 held in Town House, Kirkcaldy, Fife, on 23 October 1997, Publisher Thomas Telford, London, 1998, p 1 – 17.
*05- Gordon MacKerron and Frans Berkhout
*06- NDA: Strategy for the management of solid low-level radioactive waste from the nuclear industry, August 2010
*07- Department for Trade and Industry (DTI): Managing the Nuclear Legacy: a Strategy for Action, CM 5552, HMSO, London, July 2002.
*08- The Committee on Radioactive Waste Management: Managing our Radioactive Waste Safely, CoRWM’s recommendations to Government, Doc 700, HMSO, London, July 2006
*09- The Committee on Radioactive Waste Management: Re-iteration of CoRWM’s Position on Nuclear New Build, Doc 2162.2, HMSO, London, September 2007
*10- Defra/BERR: Managing Radioactive Waste Safely: A Framework for Implementing Geological Disposal, Cm 7386, HMSO, London, June 2008.
*11- World Nuclear News: Waste Plan Revealed, 12 June 2008
*12- Blowers, MacKerron, Allan, Wilkinson, Pitt and Pickard: New Nuclear Build and the Management of Radioactive Wastes, Letter to Secretary of State from Former Members of CoRWM, 20 November, 2009
*13- BBC News: Nuclear waste storage options examined, 15 January 2010
*14- NDA: Geological Disposal, Steps towards implementation, March 2010 p.24
*15- BBC News on line: Budget cuts caution on UK nuclear waste plan, 7 July 2010
*16- NDA, Review of timescales for geological disposal of higher activity radioactive waste, 22 December 2011
*17- NDA: Geological Disposal. Review of Options for Accelerating Implementation of the Geological Disposal Programme, December 2011
*18- NDA, Review of timescales for geological disposal of higher activity radioactive waste